+8618581533864
Search
enLanguage
Forklift Battery Charger Single Phase Delong Lead Acid Battery Charger 24V 12A

Forklift Battery Charger Single Phase Delong Lead Acid Battery Charger 24V 12A

Most of the traditional battery chargers are composed of power frequency transformers and rectifier circuits (or thyristor voltage regulators), which are large in size, low in efficiency and poor in reliability. A full charge will shorten the life of the battery.
Send Inquiry
Product Details of Forklift Battery Charger Single Phase Delong Lead Acid Battery Charger 24V 12A

Product Introduction

We have stepped into a brand-new development stage towards the development goal of becoming an international first-class comprehensive service provider of ATV Go Kart Charger, Electricl Motorcycle Charger, 48v Onboard Charger for Sweeper. We have a clear work plan and progress requirements, a clear document response time and a zero-waiting work style. Owing to very good support, a variety of high quality merchandise, aggressive costs and efficient delivery, we love an excellent name among the our clients. Our business processes are standardized, institutionalized and simplified for the convenience of our customers.

    3.3kw onboard chargerr 3.3kw onboard charger

    Most of the traditional battery chargers are composed of power frequency transformers and rectifier circuits (or thyristor voltage regulators), which are large in size, low in efficiency and poor in reliability. A full charge will shorten the life of the battery.

Application areas

    Widely used in various starting backup power sources, electric vehicles, electric sightseeing cars, electric sightseeing cars, electric patrol cars, electric trucks, electric golf carts, electric forklifts, electric trucks, battery cars, stackers, mining electric vehicles, Electric amusement equipment, electric sweepers (scrubbers), electric tractors, electric lifts, ATVs, four-wheeled vehicles, old-fashioned scooters and other lead-acid batteries, lithium battery charging and other fields.

Product performance characteristics

  1. Advanced technology: The whole machine adopts switching power supply technology and intelligent charging technology.

  2 High stability: The switching power supply control chip adopts imported military-grade integrated circuits, which are stable and reliable, with low failure rate and high reliability.

  3. Using pulse width modulation technology, high efficiency, high power factor; low ripple factor, little interference to other equipment.

  4. Charging characteristics: using intelligent charging technology, the charging process does not require manual intervention.

  5. The portable air-cooled type adopts an intelligent air-cooled design. The fan speed is automatically and intelligently adjusted according to the power, which effectively prolongs the life of the fan. The reasonable structure and heat dissipation design minimize the volume and weight of the whole machine and improve the portability of the charger.

  6: Natural cooling design without fan and fully enclosed, waterproof and dustproof, high reliability.

Technical Parameters

Item

Parameters

Ac Input Wide Voltage Range

AC90v-264v

AC Input Frequency Range

40-70HZ

With APFC Function,Power Factor

≥0.98

Soft Switching Technology,Efficiency

≥93%

Protection Level

IP67

Operating Temperature

-40℃~ +60℃

Storage Temperature

-55℃~ +100℃

CAN Communication

Optional

12v3a Auxiliary Power Supply

Optional

LED Light Indicator for Charging Process

Standard

Noise

≤45dB

Overall Size

294x210x111(mm)

Net Weight

5.9kg

SMHC3 3.3KW1

Specifications

Specifications &Models

Input Voltage Range

Rated Output Voltage

Max Output Voltage

Max Output Current

SMHC3-4842A

AC90~264V

48V

66V

42A

SMHC3-6040A

AC90~264V

60V

82.5V

40A

SMHC3-7240A

AC90~264V

72V

99V

40A

SMHC3-8440A

AC90~264V

84V

116V

40A

SMHC3-9632A

AC90~264V

96V

132V

32A

SMHC3-12025A

AC90~264V

120V

165V

25A

SMHC3-14423A

AC180~264V

144V

198V

23A

SMHC3-31210A

AC90~264V

312V

440V

10A

Configuration (optional)

On-board charger standard

1, Input plug(optional)

2, PP and CP signal (need marked)

3, Output connector(optional)

4, Charging indicator(Built -in or External)

6. Anti-walking line

7. 6, Handle (optional)

7, Auxiliary power 12v 3a/5a (optional)

8, CANBUS:Yes (optional)

9, Temperature sensor (only for lead acid battery)

Application

06

Our Forklift Battery Charger Single Phase Delong Lead Acid Battery Charger 24V 12A has a good reputation in domestic and international markets, so that our company and users in the market competition to achieve a win-win situation. Our company has a long history, with many years of inheritance, innovation, excellence and continuous innovation. We actively participate in market construction and accelerate the layout of international production capacity cooperation.

Hot Tags: 72v battery charger for car, China, suppliers, manufacturers, factory, wholesale, in stock, 18650 Battery Charger, 96v Charger for Car, 24v Forklift Battery Charger, Electricl Motorcycle Charger, 48v Ebike Fast Charger, 48v Golf Cart Charger

[[ProKeywords]]

SPEC DATA

Send Inquiry

Send a Message